The installation of shower room is not a trivial matter, but an important thing worthy of everyone’s serious treatment. Once the installation is poor, it will affect consumers’ use experience. So, how should the shower room be installed? What are the precautions during installation?

Pay attention to the following items before installation:

1. Measure the reserved size of bathroom space and the size of shower room in advance;

2. The shower room shall be handled vertically. Because the glass is easy to collide and break, great care shall be taken during handling to prevent collision with hard objects;

3. After the package is removed, the glass shall be placed vertically and stably against the wall. If it is not placed stably, it is very likely to cause the risk of glass damage or hurt the people nearby;

CP-30YLB-0

The installation steps are as follows:

1: Bottom basin installation

Be careful when installing the bottom basin. Testing water is an important step. Then check whether the product packaging is complete. After opening, check whether the configuration is complete and whether there are omissions. When the necessary tools are ready, you can prepare to install the bottom basin. First, assemble the bottom basin assembly, then adjust the level of the bottom pan, and finally ensure that there is no water in the basin and bottom. The hose can be stretched according to the length requirements. After the bottom basin is firmly connected with the floor drain, a water test shall be carried out to check whether the water is unblocked.

setup script

 

2: Determines the layout of the bathroom exhaust pipe

In order to avoid accidentally blowing up the hidden pipeline during drilling, the drilling position of aluminum against the wall shall be determined with pencil and level before installation, and then the hole shall be drilled with impact drill. The overall safety of the shower room is closely related to the proper installation of the shower room, and no detail can be ignored. It is necessary to check whether the drilling is accurate, whether the accessories are installed correctly and whether the waterproof sealing is completed.

3: Fixed tempered glass

When fixing the glass of the shower room, the glass shall be clamped and locked at the drilled hole of the bottom basin. When the bottom of flat glass or curved glass enters the glass slot, slowly push in the aluminum attached to the wall, and then fix it with screws. After fixing the glass, drill holes at the corresponding position above the glass, then install the fixing seat and connect the jacking pipe, and then fix it on the top of the glass with an elbow sleeve. After measuring the position, install the shelf, tighten the laminate nuts, fix the glass of the laminate and keep it vertical and horizontal. Finally, install the hardware of the movable door, install the hinge on the reserved hole of the fixed door, then adjust the axis position of the lotus leaf until the door feels comfortable.

4: Install water absorbing strip or water retaining strip

Use silicon gel to connect aluminum to the joint of wall, bottom basin and glass, then check whether the parts are comfortable and smooth. If any problem is found, adjust it immediately. After adjustment, check whether the corresponding screws are tightened again to make the shower room firm, and finally wipe the shower room with a rag.

5Other accessories, such as shower head, shower panel, shower bracket, handheld shower head.

6. The shower room must be firmly connected with the building structure without shaking; The appearance of the shower room after installation shall be clean and bright. The sliding door and sliding door shall be parallel or vertical to each other, symmetrical left and right. The sliding door shall be opened and closed smoothly without gap and water seepage. The shower room and the bottom basin shall be sealed with silica gel.